geothermal borefield construction

Project Highlights

Pickering Middle School Project, Lynn, MA 

The Pickering Middle School project involves the construction of a new 5-story, approximately 183,000-square-foot facility, partially funded by the Massachusetts School Building Authority (MSBA). A ground source heat pump system has been proposed to provide sustainable heating, cooling, and domestic hot water for the building. The geothermal loop field design includes 90 quad loops, each reaching a depth of 800 feet. ThermoLync LLC has been retained to provide geothermal loop field design and construction administration services.

Photo credit: https://pickeringmsbuildingproject.com

Pickering Middle School Project

Town of Eason Municipal Complex Project, Easton, MA 

The Town of Easton is undertaking a crucial public safety & public works facilities replacement project to enhance essential services for the community. The project involves the construction of 3 new buildings: a combined DPW facility, police and fire headquarters, and fire substation. Ground source heat pump systems with 3 separate geothermal loop fields have been proposed to provide sustainable heating and cooling for all the three buildings. The geothermal loop field is designed to consist of a total of 72 U-bend loops, each 600 feet deep. ThermoLync LLC is responsible for the design of the geothermal loop field and for providing construction support services.

Photo credit: https://eastonpsw.com/

Easton Municipal Complex Project

Woods Hole Ferry Terminal Reconstruction Project, Falmouth, MA 

The Woods Hole Ferry Terminal Reconstruction Project involves the construction of new Terminal and Utility buildings.  Ground source heat pump systems with two separate loop fields are proposed to provide sustainable heating and cooling for the buildings.  The Terminal Building’s loop field includes 27 U-bend loops, each 250 feet deep, while the Utility Building’s loop field includes 12 U-bend loops at the same depth. ThermoLync LLC was retained to provide construction administration services related to the geothermal loop field installation, including submittal and RFI response management, as well as construction observation.

Photo credit: https://www.steamshipauthority.com/news/15-woods_hole_terminal_reconstruction_project

Woods Hole Terminal Geothermal